S311 pump enclosure roof framing plan for Reeves County ESD 3

S311 / ASI 21 / Pump enclosure roof framing

FROM VISION
TO REALITY.

Structural steel erection + roof substrate preparation

01 / SCOPE

FROM THE DETAIL
TO THE FIELD.

ACI is coordinating the roof structure from the masonry bearing points through steel erection, substrate installation and dry-in. The sequence below documents the work as the pump enclosure takes shape at Reeves County ESD 3.

Location
Balmorhea, Texas
Facility
ESD Station 3
Work
Steel + roof substrate
Status
In progress
CMU pump enclosure under construction at Reeves County ESD 3
01

CMU shell

The pump enclosure rises from the foundation with the masonry shell ready to receive the roof structure.

Crew installing structural steel roof framing at Reeves County ESD 3
02

Steel erection

Structural members are set, aligned and tied into the load-bearing masonry to establish the roof profile.

Crew installing roof substrate on the pump enclosure
03

Roof substrate

The field team installs the roof substrate over the framed assembly, preparing a clean and continuous surface.

Roof underlayment installed on the pump enclosure in Balmorhea
04

Dry-in

Underlayment brings the enclosure to dry-in and protects the assembly ahead of the final standing-seam roof system.

Built for the region. Accountable in the field.